Skip to content

Guides

Four procedures to run. Each says what you need before starting and what you hold when you finish.

ISO 27001
3 DC
SLA 99.99%

14-day trial: run a first workload

Form, no credit card. VMs, Kubernetes, GPUs included.

Before starting
Nothing: the form is enough, an engineer opens access.
What you end up with
A first workload running on the infrastructure, GPUs included.

VMware exit to a Swiss cloud: checklist

VMware alternative: VMDK inventory, Windows, VLAN → VPC, backup, cutover. For CIOs and architects.

Before starting
Access to your vSphere inventory and your Broadcom renewal date.
What you end up with
Forty-five checks to tick, from inventory to rollback.

Kubernetes across three Swiss datacenters

Sovereign managed Kubernetes in Switzerland: Hidora SA, Talos, CNCF, PVCs on Geneva, Gland and Lucerne. 14-day trial, GPUs included.

Before starting
A cluster created in the console and its kubeconfig downloaded.
What you end up with
A workload spread across the three sites, and the check that proves it.

CLOUD Act and GDPR: a Switzerland region is not a Swiss cloud

CLOUD Act, GDPR and jurisdiction: why AWS/Azure “Switzerland” remains a US group, and where Hikube (Hidora SA, 3 Swiss DCs) sits among IaaS with no US parent.

Before starting
None. Read before choosing a provider, not after.
What you end up with
Enough to separate operator from location in a file.

This estimate stays on this page: print it or export it as a PDF from your browser. For a costed study on your own scope, talk to an engineer.

Contact us

Ready to run on 100% Swiss infrastructure?

14-day trial, no credit card. GPUs included.